The scope of work consisted of the design and construction of Clinical Research Building – R&D Centre’s with Central Utility Plant/Service Building.
SITC of Civil, Finishing and Interior Works
SITC of Electrical Works – 66kV/11 KV Substation, 11 kV Transformers/CSS, HT and LT Panels, HT and LT Cables, MCC/PCC/Distribution Boards, Earthing, Lighting and Power Points etc.
SITC of Extra Low Voltage Works—Fire Detection and Alarm System, Public Address System, Building Management System, Security Surveillance – CCTV System, IT Solution and EPABX Works.
SITC of HVAC and Basement Ventilation System –Primary CHW pumps, Secondary CHW pumps, CW pumps, FRP CT, AHU, FCU, Piping, Ducting, Insulation, Parking Ventilation fans, Lift-well/Staircase Pressurization System, Centrifugal fans and allied works.
SITC Work for Fire Fighting—Pump, Piping, Fire Hydrant, Sprinkler, etc.
SITC of Plumbing Work—Complete Plumbing, Water Supply and Sanitary Fittings, Sewage Treatment, Rain Water Harvesting, etc.